For the ESLP project I had decided to do the garden clean up. For that, a few others and me were assigned to shovel mulch and put those in the pathways and garden beds. We got to work and started shoveling the mulch into the wheelbarrows, for the bark mulch we took the wheelbarrows to the garden bed, dumped it on to the garden bed, and the spreading the mulch around to cover the garden bed. We repeated this process for two or three times. Then, after that was done, the next was to cover the pathways. We went back to the parking lot to get the cedar bark this time. After we dumped the cedar bark into the wheelbarrow, we carried this to the area near the compost area, then dumped them onto the pathways. We did this for a few times, until it was looking nice for the garden. This was for the 1st hour and 20 minutes of the two hours required.
For the last 40 minutes of the two hours required, I did the same work as before. Shoveling the mulch and placing those into the wheelbarrows. This time we used the buckets and had a bit more help with the bark mulch. Then, for the last few minutes I and another person assisted with the shoveling of the cedar bark mulch. We just had to fill the buckets in and pass those to the others. All this from the parking lot, which after we were done. The mulch piles looked significantly smaller than before.
 |
Pic of Garden Bed after the 1 hour and 20 mins |
 |
Pic of area near compost after the 1 hour and 20 mins |
 |
Pic of the area near compost after the remaining 40 mins |
 |
Pic of Garden Bed after the remaining 40 mins |
No comments:
Post a Comment